We are making slow but steady progress on the Option #11 build. This week the throttle valves system was finished. Finished with a beautiful Carbon topping this part of the bike should become one of the visible eye catcher. Here´s some detailed impressions.
The entire system was entirely disassembled, clean, polished and partialy equipped with new parts.
All parts in black done with 2K lacquer.